Skip to main content
Figure 7 | Malaria Journal

Figure 7

From: Standardizing the measurement of parasite clearance in falciparum malaria: the parasite clearance estimator

Figure 7

The relative difference in slope half-life rate comparing the final slope half-life to that calculated by fitting a linear model to all the data. (Note that only those profiles for which tlag > 0 were used here, for comparison purposes). Relative difference in slope half-life is calculated as the slope half-life from lag regression minus the slope half-life from linear regression, divided by the slope half-life from lag regression.

Back to article page