Skip to main content

Table 3 Anopheles stephensi survival after exposure to cement tiles

From: Storage and persistence of a candidate fungal biopesticide for use against adult malaria vectors

Time after exposure

Treatment

Median Lethal Time days (95% C.I.)*

Log rank statistic (Significance compared to control)

Time to 80% mortality days (± 1 SEM)*

Day 1

Control

11.0 (9.89-12.11)

---------

Not achieved

Pyrethroid

6.0 (4.77-7.23)

58.5 (P < 0.001)

10 (± 0.82)

B. bassiana

7.0 (6.45-7.55)

89.1 (P < 0.001)

11.0 (± 0.71)

Week 1

Control

12.0 (10.55-13.45)

 

Not achieved

Pyrethroid

Not achieved

4.1 (P = 0.042)

Not achieved

B. bassiana

7.0 (5.99-8.02)

42.2 (P < 0.001)

Not achieved

Month 1

Control

9.0 (8.25-9.75)

---------

12.8 (± 0.63)

Pyrethroid

9.0 (8.27-9.73)

0.96 (P = 0.33)

12.0 (± 0.71)

B. bassiana

9.0 (8.07-9.93)

2.48 (P = 0.12)

12.0 (± 0.41)

Month 2

Control

13.0 (12.36-13.64)

---------

Not achieved

Pyrethroid

13.0 (12.22-13.78)

0.01 (P = 0.92)

Not achieved

B. bassiana

8.0 (7.33-8.67)

52.63 (P < 0.001)

12.0 (± 0.58)

Month 3

Control

13.0 (11.52-14.84)

---------

Not achieved

Pyrethroid

11.0 (8.72-13.28)

1.8 (P = 0.18)

Not achieved

B. bassiana

7.0 (6.55-7.45)

63.3 (P < 0.001)

11.0 (± 1.29)

Month 4

Control

Not achieved

 

Not achieved

Pyrethroid

---------

---------

---------

B. bassiana

Not achieved

16.5 (P < 0.001)

Not achieved

Month 5

Control

Not achieved

---------

Not achieved

Pyrethroid

---------

---------

Not achieved

B. bassiana

Not achieved

4.4 (P = 0.037)

Not achieved

  1. ‘Not achieved’ indicates that the desired level of mortality (Median Lethal Time or 80%) was not reached before the end of the 14 day monitoring period.