Phase II - cement tested at a distance of 1 m at T0 and T12 | Timepoint | Control 1 | Control 2 two layers of control paint on walls and ceiling | One layer IP on walls at 1 kg/6 sq m | One layer IP on walls and ceiling at 1 kg/6 sq m | Two layers IP on walls at 1 kg/6 sq m | Two layers IP on walls and ceiling at 1 kg/6 sq m |
---|---|---|---|---|---|---|---|
An. gambiae | T0 | 0a | 3.4a | 100b | 100b | 100b | 100b |
Kisumu | T12 | 1.5a | 3a | 35.6b | 98.4c | 100c | 100c |
Cx. quinquefasciatus S-Lab | T0 | 8.3a | 0a | 100b | 100b | 100b | 100b |
T12 | 1.8a | 3a | 60b | 96.2c | 100c | 100c |