Fig. 3

A House improvement pre-intervention; B closed gable; C screened ‘windows’; D former water body filled with soil; E drainage passage created to prevent standing water; F trained HI committee member applying Bacillus thuringiensis israelensis to remaining water bodies. Photographs by H. van den Berg, Malawi, 2015 and 2016