Fig. 2From: Implementing OECD GLP principles for the evaluation of novel vector control tools: a case study with two novel LLINs, SafeNet® and SafeNet NF®GLP study work flow. The boxes indicates the GLP procedures performed from the study initiation to the study completionBack to article page