Figure 2From: Establishment of a large semi-field system for experimental study of African malaria vector ecology and control in TanzaniaKey steps in the construction of the IHI SFS. (a) digging holes for foundation posts, (b) pouring the concrete foundation platform, (c) installing the netting, (d) roof gutters draining precipitation during peak rainfall, (e) French drain system installed under soil to divert surface water run off, (f) double entry door system.Back to article page