From: Cost effectiveness of malaria vector control activities in Sudan
Operational monitoring | Achievements and inputs utilized |
---|---|
IRS | |
Coverage | 97% of the target rooms in two villages |
Timing | By the beginning of the rainy season (August, 2017) and at the end of the rainy season (December, 2017) |
Frequency | Two rounds per year |
Pesticides | (ficam) bendiocarb |
Dosage | 200mg\m2 |
Quantity | 180.2 kg per year |
Equipment | Hudson pump (good condition) + uniform + tools of pump spear parts |
Performance | -The spraying was conducted daily -End of the campaign report was done -Pre-training of workers, technicians and supervisors was performed as well as data entering personnel |
Days needed | 8 days a year (2 villages, 2 rounds for 2days each village) |
LLINs | |
Coverage | 95.2% of the targeted persons |
Timing | Early before the rainy season, 2017 |
Frequency | once every three years |
Pesticides | Deltamethrin |
Dosage | 50 mg/m2, Rectangular – 190 * 180 * 150 cm Mesh – 24/cm2, 20 washes (approx. 3 years) |
Quantity (number of nets distributed) | 9,846 nets |
Equipment | No |
Performance | Distribution of nets on all targeted persons |
Days needed | 2 days every three years (one day for each village) |
LSM | |
Coverage | 25–50% of the targeted sites (water bodies) |
Timing | All year long |
Frequency | Once per week |
Pesticides | Temephos 50% ECW/V |
Dosage | 10 cc Temephos in 10 litters water |
Quantity | 140 L per year |
Equipment | Hudson pump (good condition) + uniform + tools of pump spear parts |
Performance | - Wad Madani City was divided into sectors - Health workers performed spraying operations (coverage the mosquito breeding sites by insecticide) - End of the work report was done and delivered to office of malaria control |
Days needed | 52 days a year (one day a week for a year) for each district |
EM | |
Coverage | Approximately 30% of the target sites at each district |
Timing | Before and during rainy season |
Frequency | once a year |
Pesticides | NO |
Dosage | NO |
Quantity | NO |
Equipment | Loader, boklen, tractor, monitoring car, drill equipment and suction pump |
Performance | -Simple environmental modification and manipulation approaches were conducted annually (mainly opening of rain drain canals) - End of the season report was done |
Days needed | 15 days a year (for two districts) |